Customized stainless steel investment casting parts supplier
Dongying JC Metal is Customized stainless steel investment casting parts supplier with ISO 9001 Certificate.We can customize as client’s request from size, materials and applications.

The basic info:
1. Main material
A356/A319/A413/ZL101/ZL102/ZL104/ZL107/LM6//LM/20/LM25/Carbon steel/Mild steel/Cold roll steel/Hot roll steel/Zinc plate/Stainless steel/ Aluminum/ SECC/SGCC/ SPCC/SPHC
2. Process
Investment casting+machining+surface treatment
3. Machining equipment
10 sets CNC center, 12 sets CNC lathe, drilling equipment, turning equipment…
4. Casting tolerance
±0.02-0.05, or as drawing require.
5. Machining tolerance
Up to IT7, Ra 0.8~3.2 , according to customer requirement
6. Surface treatment
Shot/sand blast, polishing, Surface passivation, Primer Painting , Powder coating, ED- Coating, Chromate Plating, zinc-plate, Dacromat coating, Finish Painting
7. Application&serve
Metal Parts Solution for Vehicle, Agriculture machine, Construction Machine, transportation equipment, Valve and Pump system, such as engine bracket, truck chassis bracket, gear housing , gear cover, pulley, flange, connection pipe, pipe, hydraulic valve , valve housing ,Fitting , flange, wheel, fly wheel, oil pump housing, starter housing, coolant pump housing, transmission shaft , transmission gear, sprocket, chains etc.
8. Capacity
500 tons per year
9. Drawing format
Various type of 2D or 3D drawings are acceptable,such as JPG, PDF, DWG, DXF,IGS, STP, X_T, SLDPRT etc.
10.
Package
·Plastic Bag+ Carton box
·Plastic Bag+ Carton Box + Wooden Case
·Packing according to customer design requirement
11. Delivery
·Sample and mold: 55-60 days
·Order:45-55 days
FAQ:
1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
2. What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
3. How to pay?
For small quantity, we could provide Paypal, Paypal commission will be added to the order.
For the big one, T/T is preferred.
4. How to ship?
For small quantity, we have cooperation with TNT, FEDEX, UPS etc.
For big quantity, air or sea would be available for you to choose.
5. What about the packing details?
We attached our normal packing details.
If you have any special requirements, we would be willing to help.
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.When you made your order, you would know exactly.